2024
[JCCBI and Structura] - December 2 - December 6, 2024 - Posted November 29, 2024
[Groupe Civitas] - November 25 - December 6, 2024 - Posted November 22, 2024
[JCCBI and WSP Canada Inc.] - November 25 - November 29, 2024 - Posted November 22, 2024
[Horizon] - November 19 - November 30, 2024 - Posted November 19, 2024
[AG-360 with technicians] - October 16 - November 30, 2024 - Posted October 16, 2024
[Horizon] - October 1 - November 30, 2024 - Posted September 27, 2024
[Groupe Civitas] - November 4 - November 8, 2024 - Posted November 4, 2024
[Horizon] - November 4 - November 8, 2024 - Posted November 4, 2024
[Jacques-Cartier and Champlain Bridges Inc./Les Services EXP Inc.] - October 7 - November 1, 2024 - Posted October 7, 2024
[St. Lawrence Seaway Management Corporation & Grues N-Rik] - October 29 - 31, 2024 - Posted October 29, 2024
[St. Lawrence Seaway Management Corporation & Infrastructel] - October 24 - 31, 2024 - Posted October 23, 2024
[Horizon] - October 1 - October 31, 2024 - Posted October 1, 2024
[Horizon] - October 1 - October 31, 2024 - Posted October 1, 2024
[Groupe Civitas] - October 23 - 30, 2024 - Posted October 22, 2024
[St. Lawrence Seaway Management Corporation & Grues N-Rik] - October 21 - 23, 2024 - Posted October 21, 2024
[Arsenault AG] - September 27 - October 16, 2024 - Posted September 26, 2024
[Jacques-Cartier and Champlain Bridges Inc./EXP] - August 26 - October 4, 2024 - Posted August 27, 2024
[AG-360] - September 4 - September 30, 2024 - Posted September 4, 2024
[Horizon] - August 29 - September 30, 2024 - Posted August 29, 2024
[AG-360] - August 22 - September 30, 2024 - Posted August 22, 2024
[AG-360] - August 14 - September 30, 2024 - Posted August 15, 2024
[AG-360] - August 14 - September 30, 2024 - Posted August 14, 2024
[Jacques Cartier and Champlain Bridges Incorporated/Les Services EXP Inc.] - August 26 - September 9 - Posted August 6, 2024
[AG-360] - July 24 - August 30 2024 - Posted July 24, 2024
[Groupe Civitas with technicians] - August 12 - 16, 2024 - Posted August 9, 2024
[Hydro-Quebec] - July 22 - August 15 2024 - Posted July 22, 2024
[Hydro-Quebec and subcontractors] - July 29 - August 6, 2024 - Posted July 26, 2024
[AG-360] - June 13 - July 31, 2024-Posted June 13, 2024
[Jacques Cartier and Champlain Bridges Incorporated/Stantec] - July 2 - July 19, 2024-Posted June 27, 2024
[Sansoucy with technicians] - June 26 - July 19, 2024-Posted June 27, 2024
[Jacques Cartier and Champlain Bridges Incorporated/Groupe ABS] - July 12, 2024-Posted July 11, 2024
[Groupe Civitas with technicians] - July 2 - July 12, 2024-Posted June 27, 2024
[Hydro Quebec] - May 13 - June 30, 2024-Posted May 10, 2024
[AG-360 with technicians] - May 6- June 30, 2024-Posted May 6, 2024
[AG-360 with technicians] - April 22 - June 30, 2024-Posted April 19, 2024
[Jacques Cartier and Champlain Bridges Incorporated/WSP] - June 18, 2024-Posted June 17, 2024
[AG-360 with technicians] - May 8- June 15, 2024-Posted May 8, 2024
[Jacques Cartier and Champlain Bridges Incorporated/EXP] - June 13, 2024-Posted June 12, 2024
[BC2 Consultants ] - June 4 - 7, 2024-Posted June 3, 2024
[CBC Indigenous/Radio-Canada] - May 21 - May 22, 2024-Posted May 21, 2024
[Jacques Cartier and Champlain Bridges Incorporated] - March 18 - May 5, 2024-Posted March 19, 2024
[Hydro Quebec/Asplundh and EEA (Anger Electric)] - December 2023 to May 2024-Posted December 21, 2023
[Jacques Cartier and Champlain Bridges Incorporated/Environment Faucon] - May 10, 2024-Posted May 8, 2024
2023
[Jacques Cartier and Champlain Bridges Incorporated/EXP] - April 10, 2024-Posted April 9, 2024
[Jacques Cartier and Champlain Bridges Incorporated/Stantec Experts Conseils ltée] - April 8 - 12 & 15-22, 2024-Posted April 8, 2024
[Groupe Civitas with technicians] - April 1 - 30, 2024-Posted March 28, 2024
[AG-360 with technicians] - March 8 to April 30, 2024-Posted March 6, 2024
[Groupe Civitas with technicians] - March 11 to 22, 2024-Posted March 7, 2024
[Patricia Deer and BC2 Consultants] - March 21, 2024-Posted March 15, 2024
[Jacques Cartier and Champlain Bridges Incorporated/Les Services EXP and technicians] - February 8 - 9, 2024-Posted February 7, 2024
[Groupe Civitas with technicians] - January 15 - 26, 2024]-Posted January 11, 2023
[Agir Consultants] - January 8 - 31, 2024]-Posted January 8, 2024
[Groupe Civitas with technicians] - January 24 - February 2, 2024]-Posted January 23, 2023
[Groupe Civitas] - January 9 - 19, 2024]-Posted January 8, 2023
[Groupe Civitas with technicians] - December 11 to December 22, 2023-Posted December 11, 2023
[Jacques Cartier and Champlain Bridges Incorporated/Les Services EXP and technicians] - December 6 to December 22, 2023-Posted December 5, 2023
[Hydro Quebec/Asplundh ] - December 1 -15, 2023-Posted December 1, 20233
[Groupe Civitas with technicians] - December 4 -22, 2023-Posted December 1, 2023
[Jacques Cartier and Champlain Bridges Incorporated/Les Services EXP] - December 6 to December 22, 2023-Posted December 5, 2023
[Sankia Grondin from Hydro Quebec] - October 30 to November 5, 2023-Posted October 27, 2023
[Jacques Cartier and Champlain Bridges Incorporated /Les Services EXP] - October 1 to November 3, 2023-Posted September 27, 2023
[AG-360 with their technicians] - August 9 to September 30, 2023-Posted August 9, 2023[Jacques Cartier and Champlain Bridges Incorporated/EXP and technicians] - August 9 to September 30, 2023-Posted August 31, 2023
[Groupe Civitas with technicians] - July 31 to August 11, 2023-Posted July 31, 2023
[Hydro Quebec] - July 10 to July 15, 2023-Posted July 7, 2023
[Hydro Quebec] - May 26 to July 21, 2023-Posted May 25, 2023 - UPDATED June 28, 2023
[AG-360 and technicians] - April 28 to July 30, 2023-Posted April 28, 2023
[AG-360 and technicians] - April 14 to June 30, 2023-Posted April 13, 2023
[AG-360 and technicians] - March 30 - June 30, 2023-Posted March 29, 2023
[Hydro Quebec and technicians] - March 6- June 30, 2023-Posted March 3, 2023
[Jacques Cartier and Champlain Bridges Incorporated/Les Services EXP and technicians] - June 19 to June 23, 2023-Posted April 28, 2023
[Hydro Quebec and technicians] - May 1 to June 16, 2023-Posted April 28, 2023
[Groupe Civitas and technicians] - June 2 to June 9, 2023-Posted June 1, 2023
[Agir Consultants and technicians] - May 11 to May 31, 2023-Posted May 11, 2023
[Hydro Quebec and technicians] - April 6 - May 31, 2023-Posted April 6, 2023
[AG-360 with technicians] - February 20 - May 30, 2023-Posted February 17, 2023
[JCCBI/EXP and technicians] - April 25 to May 27, 2023-Posted April 24, 2023
[Groupe Civitas and technicians] - May 26, 2023-Posted May 25, 2023
[Groupe Civitas and technicians] - May 2 to May 19, 2023-Posted May 1, 2023
[JCCBI/EXP and technicians] - April 17 - May 5, 2023-Posted April 14, 2023
[Agir Consultants and technicians ] - April 1- April 29, 2023-Posted March 3, 2023
[Groupe Civitas and technicians] - April 14 to April 28, 2023-Posted April 14, 2023
[JCCBI and technicians] - March 26- March 31, 2023-Posted March 24, 2023
[EFFIGIS with technicians] - February 20 - March 3, 2023-Posted February 17, 2023
[Groupe Civitas and technicians] - February 28 - March 17, 2023-Posted February 27, 2023
[Hydro Quebec and sub-contractor Asplundh] - February 27 - March 17, 2023-Posted February 24, 2023
[SLSMC and Le Groupe LML Ltd.] - February 20 - March 15, 2023-Posted February 17, 2023
[AG-360 with technicians] - February 16 - March 20, 2023-Posted February 15, 2023
[AG-360 with technicians] - February 6 - March 20, 2023-Posted February 3, 2023
[St. Lawrence Seaway Authority and Elecso ] - February 6 - March 16, 2023-Posted February 2, 2023
[AG-360 with technicians] - February 16 - March 20, 2023-Posted February 15, 2023
[Groupe Civitas with technicians ] - January 16 - 27, 2023-Posted January 17, 2023
2022
[Mr. Sheldon Harvey, volunteers and KEPO] - December 17, 2022-Posted December 14, 2022
[Groupe Civitas with technicians] - November 24 - December 16, 2022-Posted November 28, 2022
[Agir Consultants and technicians] - November 1 - November 30, 2022-Posted October 31, 2022
[Hydro Quebec ] - November 1 - December 31, 2022-Posted October 28, 2022
[Jacques Cartier and Champlain Bridges Incorporated and technicians] - November 1 - November 30, 2022-Posted October 31, 2022
[Jacques Cartier and Champlain Bridges Incorporated/EXP and technicians] - October 31 - November 30, 2022-Posted October 27, 2022
[Groupe Civitas and technicians] - October 24 - November 4, 2022-Posted October 20, 2022
[Jacques Cartier and Champlain Bridges Incorporated (JCCBI) and technicians] - October 17 - October 31, 2022-Posted October 17, 2022
[Ministere des Transport (MTQ) and technicians] - October 17 - October 29, 2022-Posted October 14, 2022
[AG-360 and technicians] - September 30 - January 30, 2022-Posted September 29, 2022
[Hydro Quebec] - September 19 - October 31, 2022-Posted September 15, 2022
[Ciné Testament] - September 9 & 15, 2022-Posted September 8, 2022
[Hydro] - September 7, 2022-Posted September 7, 2022
[Groupe Civitas and technicians] - August 3 - 19, 2022-Posted August 2, 2022
[Jacques Cartier and Champlain Bridges Incorporated/EXP and technicians] - August 1 - September 16, 2022-Posted July 29, 2022
[Groupe Civitas with technicians] - July 27 - August 5, 2022-Posted July 26, 2022
[AG-360 and technicians] - July 18 - October 30, 2022-Posted July 14, 2022
[Jacques Cartier and Champlain Bridges Incorporated (JCCBI)/Geniarp Mosaic 3D and technicians] - July 14 - 18, 2022-Posted July 13, 2022
[Groupe Civitas and technicians] - July 14 - 29, 2022-Posted July 13, 2022
[Jacques Cartier and Champlain Bridges Incorporated (JCCBI) and technicians] - July 13, 2022-Posted July 12, 2022
[Jacques Cartier and Champlain Bridges Incorporated (JCCBI)/EXP] - July 4 - 29, 2022-Posted June 29, 2022
[Hydro Quebec/RML/Pangeos] - July 1 - 29, 2022-Posted June 29, 2022
[Agir Consultants and technicians] - July 1- 29, 2022-Posted June 29, 2022
[Groupe Civitas with technicians ] - June 23 - July 8, 2022-Posted June 23, 2022
[Agir Consultants and technicians] - June 7 - 1, 2022-Posted June 7, 2022
[Jacques Cartier and Champlain Bridges Incorporated/EXP and technicians] - June 6 - 30, 2022-Posted June 3, 2022
[Hydro/WSP and technician] - June 1, 2022-Posted May 31, 2022
[JCCBI/WSP and technicians] - May 23-30, 2022-Posted May 20, 2022
[JCCBI/EXP and technicians] - May 23-June 10, 2022-Posted May 20, 2022
[Agir Consultants and technicians] - April 1-29, 2022-Posted March 31, 2022
[AG-360 with technicians] - March 28- April 1, 2022-Posted March 24, 2022
[Groupe Civitas with technicians] - March 28- April 1, 2022-Posted March 24, 2022
[AG-360 with technicians] - March 16- June 30, 2022-Posted March 15, 2022
[ElectroSag for First Nations Fiber] - March 1-11, 2022-Posted March 1, 2022
[Agir Consultant and technicians] - February 28 - March 3, 2022-Posted February 25, 2022
[Agir Consultant and technicians] - February 24 - March 3, 2022-Posted February 23, 2022
[Groupe Citivas and technicians] - February 21 - March 4, 2022-Posted February 17, 2022
[Agir Consultants and technicians] - February 9 - 14, 2022-Posted February 8, 2022
[Agir Consultants and technicians] - February 7 - 28, 2022-Posted February 4, 2022
[First Nations Fiber and technicians] - February 1 - March 18, 2022- Posted January 28, 2022
[Agir Consultants and technicians] - January 31 - Feb 3, 2022- Posted January 28, 2022
[St Lawrence Seaway Management Co.] - January 31 - March 31, 2022- Posted January 28, 2022
[Hydro Quebec and technicians] - January 28, 2022- Posted January 27, 2022
[Agir Consultants and their technician] - January 19 - January 20, 2022- Posted January 19, 2022
[Agir Consultants and their technician] - January 10 - January 12, 2022- Posted January 7, 2022
2021
[Group Citivas with technicians ] - November 23 - December 3, 2021- Posted November 22, 2021[Hydro Quebec with technicians] - November 12, 2021- Posted November 10, 2021
[Hydro Quebec with technicians] - November 4, 2021- Posted November 2, 2021
[Group Citivas with technicians] - November 1 - 12, 2021- Posted October 28, 2021
[Group Citivas with technicians] - November 1 - 12, 2021- Posted October 26, 2021
[Group Citivas with technicians] - October 21, 2021- Posted October 20, 2021
[Hydro Quebec/WSP and technicians] - October 20, 2021 - October 21, 2021- Posted October 18, 2021
[AG-360 and technicians] - October 12, 2021 - February 1, 2022- Posted October 12, 2021
[Hydro Quebec/WSP and technicians] - September 29, 2021- Posted September 28, 2021
[Groupe Citivas with technicians] - September 24 - October 8, 2021- Posted September 23, 2021
[Hydro Quebec/WSP and technicians] - September 14, 2021- Posted September 13, 2021
[Jacques Cartier and Champlain Bridges Incorporated/EXP and their technicans] - September 12 - October 10, 2021- Posted September 10, 2021
[Agir Consultants and technician ] - September 7 - 10, 2021- Posted September 2, 2021
[Jacques Cartier and Champlain Bridges Incorporated and their technicians ] - September 1 - 8, 2021- Posted September 1, 2021
[Groupe Citivas and their technicians ] - August 30 - September 10, 2021- Posted August 27, 2021
[Jacques Cartier and Champlain Bridges Incorporated/EXP and its technicans] - August 16 - 30, 2021- Posted August 13, 2021
[Groupe Citivas and its technicans] - August 16 - 27, 2021- Posted August 13, 2021
[St. Lawrence Seaway Management Co. and its technicans] - August 9 - 12, 2021- Posted August 6, 2021
[Groupe Civitas] - July 29, 2021- Posted July 2, 2021
[Groupe Civitas] - July 27 - August 6, 2021- Posted July 26, 2021
[JCCBI and their technicians] - July 12 - July 16, 2021- Posted July 8, 2021
[AG-360 and their technicians] - July 11 - December 1, 2021- Posted July 8, 2021
[JCCBI/EXP and their technicians] - July 9, 2021- Posted July 7, 2021
[JCCBI/EXP/Techni-Arp] - June 24 - July 2, 2021- Posted June 23, 2021
[JCCBI/EXP/Techni-Arp] - June 23, 2021- Posted June 22, 2021
[JCCBI and their technicians] - June 22 - July 1, 2021- Posted June 18, 2021
[Hydro Quebec] - June 16 - 17, 2021- Posted June 15, 2021
[Jacques Cartier and Champlain Bridges Incorporated and their technicians] - June 16, 2021- Posted June 15, 2021
[ALI Excavation] - June 14 - 15, 2021- Posted June 14, 2021
[JCCBI/EXP/Techni-Arp with their technicians] - June 14 - 22, 2021- Posted June 11, 2021
[AG-360 and their technicians] - June 10 - October 31, 2021- Posted June 10, 2021
[JCCBI/EXP and their technicans] - June 7 - 11, and June 21 - 24, 2021- Posted June 4, 2021
[Groupe Civitas and their technicians ] - June 7 - 18, 2021- Posted June 4, 2021
[JCCBI & EXP and their technicians] - June 3 & 4, 2021- Posted June 2, 2021
[Legault Trudeau and technicians] - June 4 to October 1, 2021- Posted June 2, 2021
[Legault Trudeau and technicians] - May 19 to October 1, 2021- Posted May 18, 2021
[Gesma Telecom Inc. and technicians escorted by First Nations Wireless] - May 12 to December 31, 2021- Posted May 11, 2021[Agir Consultants and technician] - May 3, 2021- Posted April 30, 2021
[Legault Trudeau and their technicians] - April 19 to November 1, 2021- Posted April 20, 2021
[Groupe Civitas and their technicians] - April 19 to 30, 2021- Posted April 15, 2021
[CIMA+/Systemes Urbains] - April 14, 15, and 18, 2021- Posted April 13, 2021
[Legault Trudeau] - March 19-July 3, 2021 - Posted March 18, 2021
[Broadnet Telecom Inc and Fotech Telecom Inc] - March 22-26, 2021 - Posted March 15, 2021
[Civitas] - March 8-19, 2021 - Posted March 5, 2021
[Hydro Québec] - Feb 1 to March 31, 2021 - Posted January 25, 2021
2020
[JCCBI/EXP] - REVISED October 11 to December 23, 2020 - Posted December 11, 2020[JCCBI/EXP] - December 14 to 18, 2020 - Posted December 11, 2020
[Agir Consultants] - December 14 to 18, 2020 - Posted December 11, 2020
[Groupe Civitas and their technicians] - December 7 to 23, 2020 - Posted December 4, 2020
[Hydro Quebec] - December 1 - January 2021 - Posted November 30, 2020
[JCCBI/EXP] - November 18, 2020 - Posted November 17, 2020
[Groupe Civitas] - November 17-27, 2020 - Posted November 16, 2020
[MFFP and their technicians] - November 9, 2020 - Posted November 6, 2020
[MTQ/SNC Lavalin and their technicians] - from November 9 - 11, 2020 - Posted November 6, 2020
[Jacques Cartier and Champlain Bridges Incorporated] - from November 8 - December 18, 2020 - Posted November 6, 2020
[Jacques Cartier and Champlain Bridges Incorporated] - from November 2 - November 20 - Posted November 2, 2020
[Agir Consultants] - from October 30 - November 4 - Posted October 30, 2020
[MTQ/SNC Lavalin and technicians] - from November 2 - 4 - Posted October 30, 2020
[Legault Trudeau with technicians] - from October 30th to March 1, 2021 - Posted October 29, 2020
[Groupe Civitas and its technicians] - from October 29th to November 13th, 2020 - Posted October 28, 2020
[Xplornet/NJ Albert Telecommunications Inc] - on October 28, 2020 - Posted October 27, 2020
[Groupe Civitas] - October 26th to November 6th - Posted October 23, 2020
[Legault Trudeau] - October 26 to January 31, 2021 - Posted October 23, 2020
[Jacques Cartier and Champlain Bridges Incorporated] - October 21 - October 30 - Posted October 20, 2020
[Hydro Quebec] - October 16 - November 30 - Posted October 16, 2020
[Groupe Civitas] - October 6 - 16 - Posted October 2, 2020
[MTQ] - North Wall - October 6 - Posted September 30, 2020
[JCCBI/CP Rail] - CP Rail Overpass - September 23 - Posted September 21, 2020
[JCCBI] - Route 132 West - September 24 & 25, September 28 & 29 - Posted September 17, 2020
[Agir Consultants] Hwy 138, Blind Lady's Hill, River Road, OCR - September 21 to 25 - Posted September 16, 2020