CPKC will be on the Territory on Thursday, October 22, from 7am to 4pm, installing bollards at the Route 132 level crossing to help protect railway signalization equipment and improve safety.
The exit to the local business will remain accessible; however, the right lane will be partially blocked while crews complete the work.
Motorists are asked to slow down, drive with caution in the construction zone, and respect the Move-Over Law when emergency lights are flashing.
Work is subject to change due to weather, operational constraints, or work progression.







